Welcome
Welcome, this site will be devoted to providing information about the ongoing maintenance issues that take place at The Creek Club . As this site is developed, content will be added that demonstrates things that range from course care to comprehensive details about agronomic procedures. I hope that this will become a useful tool in communicating things that are taking place on the golf course. I will try to use the blog to explain how and why we do some of the things we do on the golf course.

Showing posts with label Aerification. Show all posts
Showing posts with label Aerification. Show all posts
Thursday, May 11, 2017
Wednesday, July 15, 2015
Friday, May 1, 2015
Tuesday, March 3, 2015
Greens Aerification
Preventative maintenance is an integral part of successful golf course management. Aeration is an extremely important maintenance practice. Although it results in a temporary disruption of the green, aeration improves water penetration into the soil, reduces soil compaction, stimulates turf grass root growth for a healthier plant, helps control thatch build-up, and improves overall growing conditions.
Monday, September 22, 2014
Monday, July 28, 2014
Zoysia Fairway 5/8 Aerification and Verticutting.
We have completed the Aerification process on all 45 Acres of Fairways and Tees and are open for play today. We were very fortunate to be closed for the whole process. It was a challenging 5 days for everyone and I am very appreciative of the staff for their tremendous efforts!
Aerification is one of those tools we use because it reduces organic matter (thatch), reduces soil compaction, Increases air exchange in the soil, water infiltration, and help promotes deeper rooting.
Aerification is one of those tools we use because it reduces organic matter (thatch), reduces soil compaction, Increases air exchange in the soil, water infiltration, and help promotes deeper rooting.
![]() |
| We aerified with 5/8 tine at 1.7 mph. |
![]() |
| Toro core processer |
![]() |
| This is the next day on the 5th hole after the whole Aerification, core processing, verticutting , blowing, mowing and Irrigation cycle was completed. |
![]() |
Wednesday, July 16, 2014
Venting Bentgrass Greens July 16th with 3/8 solid tine 2x2 spacing
Today we have completing our scheduled July 16th 3/8 solid Venting tine Aerification this will help dry the putting surface provide air and gas exchange to the root zone and help reduce stress to the Bentgrass greens.
![]() |
| Mathew our Intern from UGA Venting Greens on July 16th |
![]() |
| Toro 648 2x2 spacing with 3/8 solid tine. |
![]() |
| Rolled Greens one time. |
![]() |
| Greens Right after they have been Rolled one time . |
![]() |
| Picture of our greens 7 days After venting with 3/8 solid tine |
Wednesday, May 7, 2014
Friday, March 7, 2014
Subscribe to:
Posts (Atom)


















































