Welcome

Welcome, this site will be devoted to providing information about the ongoing maintenance issues that take place at The Creek Club . As this site is developed, content will be added that demonstrates things that range from course care to comprehensive details about agronomic procedures. I hope that this will become a useful tool in communicating things that are taking place on the golf course. I will try to use the blog to explain how and why we do some of the things we do on the golf course.




Friday, August 22, 2014

Zoysia Patch application

Last weeks cloudy and cooler weather got the Zoysia Patch active.   There are a couple of active patches on 8.  I use 8 fairway as one of my indicators to spray for patch.  Usually we spray our first  application the 2nd week in September, then 28 days later we apply our second application.  Since we have had below average temps this summer I went on and got a head start today.  The symptoms will fade fast this week because  we are getting our true August summer heat.   I plan on making two more applications. Today we sprayed Tebucanozole, Iron Man, Dispatch,  and Turf Pigments.  Preventitive application for zoysia patch are key to managing the disease.   

    Zoysia patch, caused by Rhizoctonia solani, is the most common disease of zoysiagrass in our region. Symptoms are most common in spring and fall as zoysiagrass enters or breaks winter dormancy. The patches range from just a few feet across to 20 feet or more.  Circular areas of thin, tan zoysiagrass initially develop in late September to early October during cool, rainy weather and again in April and May. Leaf blades, particularly those near the patch edge, may develop a yellow orange color, causing an orange margin.   

Friday, August 8, 2014

Drainage work 15 fairway

Drainage work on 15 fairway  was completed Wednesday.  The bubble on the left side of the fairway was not a irrigation leak. It was caused by a underground spring.

Monday, July 28, 2014

Zoysia Fairway 5/8 Aerification and Verticutting.

  We have completed the Aerification process on all 45 Acres of Fairways and Tees and are open for play today.  We were very fortunate to be closed for the whole process.  It was a challenging 5 days for everyone and I am very appreciative of the staff for their tremendous efforts!         
  Aerification is one of those tools we use because it reduces organic matter (thatch), reduces soil compaction, Increases air exchange in the soil, water infiltration, and help promotes deeper rooting.

We aerified with 5/8 tine at 1.7 mph. 









Toro core processer






This is the next day on the 5th hole after the whole Aerification, core processing, verticutting , blowing,  mowing and Irrigation cycle was completed.

Wednesday, July 16, 2014

Venting Bentgrass Greens July 16th with 3/8 solid tine 2x2 spacing


Today we have completing our scheduled July 16th 3/8 solid Venting tine Aerification this will help dry the putting surface provide air and gas exchange to the root zone and help reduce stress to the Bentgrass greens.
Mathew our Intern from UGA Venting Greens on July 16th


Toro 648 2x2 spacing with 3/8 solid tine.
Rolled  Greens one time.
 Greens Right after they have been Rolled one time .



 
Picture of our greens 7 days After venting with 3/8 solid tine
 



Thursday, June 12, 2014

Mowing and Cleaning up the love grass and Nature areas on #4




Eric is back on the Tractor Bush hogging right side of  4 tee


Ventrac  on 4 Tee slopes